Nexus 9336C-FX2 + 9364C-GX: CWDM4 Equal-BOM RFQ

×24 FX2 · ×56 GX · ×1344 CWDM4 · NX-OS · PI airflow · no public money figures (2026)

Home / News / Nexus CWDM4 equal-BOM

中文版:Cisco Nexus 9336C / 9364C 光模块 BOM 漏配清单

Four equal-BOM gates for Nexus 9336C-FX2, 9364C-GX, and CWDM4 optics
Large Cisco Nexus 100G leaf/spine RFQs usually fail before commercials start: vendors quote different NX-OS versus ACI modes, omit PI fans or region power cords, or invent optics counts from chassis headcount. This page is an equal-BOM checklist for a desensitized planning structure with N9K-C9336C-FX2 ×24, N9K-C9364C-GX ×56, and QSFP-100G-CWDM4-S= ×1344. No unit prices, line totals, or EXW subtotals appear here. Lead-time days on the source estimate are labeled industry estimate / pending confirmation—never invented ATP.
Disclaimer: Derived from a 2026-08-18 desensitized channel planning estimate for planning only. The source sheet is not a binding Cisco offer. Final SKUs, quantities, support terms, lead times, and Smart Account requirements must be confirmed in writing by Cisco or an authorized channel. This public page never republishes commercial money figures.

What equal-BOM means on a Nexus 100G fabric RFQ

An equal-BOM RFQ forces every bidder onto the same SKU map before anyone compares commercials. For fixed Nexus 9000 platforms, that map is more than chassis count: it includes fan and PSU airflow direction, regional power cords, NX-OS versus ACI mode selection, SNTC service PIDs, NX-OS image lines that may require a Smart Account, and QSFP28 optics quantities that track the port plan—not the number of metal boxes. The illustrative fabric here mixes 36-port 9336C-FX2 and 64-port 9364C-GX QSFP28 chassis with 100GBASE-CWDM4 optics (LC, ~2 km SMF).

Key takeaways
  • The desensitized equal-BOM structure is 24× N9K-C9336C-FX2, 56× N9K-C9364C-GX, and 1,344× QSFP-100G-CWDM4-S=—optics counts derive from the port plan, not chassis headcount.
  • Four silent misses sink N9K RFQs: NX-OS vs ACI mode, PI fan trays, region power cords, and the Smart Account required before NX-OS image download.
  • No unit prices or EXW subtotals are published; every lead-time figure is an industry estimate pending written channel confirmation.

Fit: data-center expansions that can share a port diagram, multi-vendor scorecards, teams that must prove optics integrity before PO. Unfit: single-line total shootouts with no part list; projects that refuse Smart Account prep when software lines mark it mandatory; buyers who want this page to republish workbook money figures.

Evidence table: chassis, accessories, optics (quantities, not money)

Line counts below come from a desensitized 2026-08-18 structure. Re-validate before purchase order. Lead days = industry estimate / pending confirmation.

BlockSKU spineQty patternEst. lead*RFQ gate
Chassis AN9K-C9336C-FX2×24~28 days36p QSFP28; CON-SNT-N9336FX2 ×24 (12 mo)
A fans / AFNXA-FAN-65CFM-PI + NXK-AF-PI×72 / ×24~14 daysPort-side intake only
A PSU / cordsNXA-PAC-750W-PI + CAB-250V-10A-CN×48 / ×48~14 / ~7 daysRegion cords must match PDU
Chassis BN9K-C9364C-GX×56~42 days64p QSFP28; CON-SNT-N9KC93CG ×56 (12 mo)
B fansNXA-FAN-160CFM2PI×224~14 daysDo not reuse 65CFM PIDs
B PSU / RMKNXA-PAC-2KW-PI + N9K-C9300-RMK×112 / ×56~42 / ~7 daysCN cords ×112
SoftwareNXOS-CS-10.6.1F×80 (24+56)~21 daysSmart Account Mandatory = Yes
ModeMODE-NXOS×80~21 daysThis BOM = NX-OS, not ACI
OpticsQSFP-100G-CWDM4-S=×1344~17 daysPort-plan driven

Hard numbers for the RFQ appendix: 80 chassis; 1344 CWDM4 optics; 72 / 224 fans by family; 160 CN power cords (48+112). A logistics footnote on the estimate also referenced a 42+30 days style channel note—still industry estimate / pending confirmation. Sample FOB point printed as None; do not invent Incoterms on the public page.

Versus view: shootout without structure vs equal-BOM RFQ

DimensionBroken shootoutEqual-BOM RFQ
Fabric map“About eighty switches”FX2×24 + GX×56 with roles and port loads
OS modeVerbal “NX-OS”MODE-NXOS ×80 + NXOS-CS-10.6.1F written
AirflowMissing fans or mixed PEPI fans + NXK-AF-PI pairs
Power cordsGeneric C13 fillerCAB-250V-10A-CN aligned to PSU counts
OpticsGuess from chassis countPort diagram → CWDM4 qty (sample 1344)
Smart AccountOpened after deliveryPre-PO when software marks Mandatory
Lead timePaste estimate days into LD clausesWritten ATP + ship waves only
CommercialsPublish EXW totalsMoney only on formal quote under NDA

TaoHan integration teams see the failure mode repeatedly: chassis land on time, optics arrive late or short, CN cords are wrong for the PDU map. Equal-BOM tables belong in the tender pack—not in a chat thread.

How to run the five RFQ gates

  1. Freeze the fabric map. Align architecture on which roles the 9336C-FX2 and 9364C-GX play, how many QSFP28 ports each role consumes, oversubscription, and whether CWDM4’s ~2 km SMF assumption holds.
  2. Lock NX-OS mode. Require MODE-NXOS and NXOS-CS-10.6.1F. If a bidder mixes ACI mode lines or drops mode selection, force a corrected equal structure before scoring commercials.
  3. Equalize airflow and cords. For FX2: NXA-FAN-65CFM-PI ×72, NXA-PAC-750W-PI ×48, CAB-250V-10A-CN ×48. For GX: NXA-FAN-160CFM2PI ×224, NXA-PAC-2KW-PI ×112, CAB-250V-10A-CN ×112, N9K-C9300-RMK ×56. Airflow must match the live floor.
  4. Gate optics integrity. Validate QSFP-100G-CWDM4-S= against the port plan (sample 1344). Red-flag quotes that slash optics without a written statement of which ports use DAC or another optic type.
  5. Prep Smart Account and SNTC. Treat Smart Account Mandatory software lines as pre-PO work. Write CON-SNT-* months (sample 12). Keep channel selection lines such as DCN-OTHER, C1-SUBS-OPTOUT, and MEM-UPG-OPT-OUT per valid config rules—do not delete them casually and invalidate the estimate.

Only after these gates should finance discuss payment milestones. Any EXW or channel total stays on the formal quote. Treat 28 / 42 / 17 day estimate fields and any 42+30 day logistics note as industry estimate / pending confirmation until ATP letters arrive.

Buyer personas: who owns which gate

  • Network architecture: Own the port map and whether optics ship with chassis in the same PO window.
  • Facilities / power-cooling: Own PI airflow and whether 2KW PSU plus CN cord counts match PDU density.
  • Procurement scorecard owner: Own equal-BOM enforcement—reject “cheaper” bids that silently cut CWDM4 lines or swap ACI/NX-OS.

If each role keeps a private spreadsheet, rack week will disagree. Keep one BOM truth file; procurement only updates confirmation columns for quantity and lead time.

Failure modes that show up before PO

  • Cutting 1344 optics down to “a few hundred” because chassis count is 80—then lighting only a fraction of the fabric.
  • Mixing 65CFM and 160CFM fan PIDs across FX2 and GX families.
  • Saying NX-OS verbally while the BOM omits MODE-NXOS or injects ACI selectors.
  • Shipping non-CN cord SKUs into a PRC PDU environment.
  • Discovering Smart Account Mandatory only during image download week.
  • Writing estimate days into liquidated-damages clauses without channel ATP.
  • Pasting unit prices or EXW subtotals into public materials.

Fit / unfit boundary

Fit to run this equal-BOM path: projects already on Cisco Nexus 100G QSFP28, able to share a leaf/spine port diagram, willing to write chassis / fans / PSUs / optics / mode as verifiable lines, and ready for written ATP plus Smart Account process.

Unfit to force-fit: designs that must leave Cisco fabric brands without a cross-vendor equal map; media/distance that does not suit CWDM4 (very short DAC or long-haul ZR) yet copy the 1344 sample; RFQs that demand a single total and refuse a part list—fix the scoring rules first, do not PO and reverse-engineer the BOM later.

Frequently asked questions

Why can optics quantity dwarf chassis count?
The sample has 80 chassis total but 1344 QSFP-100G-CWDM4-S= optics. Optics follow the port plan and oversubscription policy, not a one-optic-per-switch rule. Lock the port map before scoring optics lines, or you will short the fabric at turn-up.
What happens if MODE-NXOS is missing?
This BOM freezes NX-OS, not ACI. Omitting MODE-NXOS or mixing ACI mode lines breaks software image, licensing, and operations handbook alignment—treat it as a hard equal-BOM failure before commercial scoring.
Can we treat 28 / 42 / 17 lead days as contractual ATP?
No. Those figures are planning-estimate days. Public copy must label them industry estimate / pending confirmation. Contract dates require written channel ATP and ship waves.
How do we contact TaoHan for a Nexus equal-BOM review?
Send chassis mix, port plan, airflow/power-cord region, and Smart Account readiness to info@021taohan.com or use the contact page. TaoHan replies on domestic integration cadence and does not publish unverified quote figures.

References

Score the port map and optics line first

If you are preparing a domestic data-center Nexus 100G leaf/spine expansion, send chassis mix, port plan, and airflow/cord region to Shanghai TaoHan Industrial. We help equalize CWDM4 quantity with topology and confirm NX-OS / PI / CN cord sets before commercials—so chassis do not arrive with dark ports.