What equal-BOM means on a Nexus 100G fabric RFQ
An equal-BOM RFQ forces every bidder onto the same SKU map before anyone compares commercials. For fixed Nexus 9000 platforms, that map is more than chassis count: it includes fan and PSU airflow direction, regional power cords, NX-OS versus ACI mode selection, SNTC service PIDs, NX-OS image lines that may require a Smart Account, and QSFP28 optics quantities that track the port plan—not the number of metal boxes. The illustrative fabric here mixes 36-port 9336C-FX2 and 64-port 9364C-GX QSFP28 chassis with 100GBASE-CWDM4 optics (LC, ~2 km SMF).
- The desensitized equal-BOM structure is 24× N9K-C9336C-FX2, 56× N9K-C9364C-GX, and 1,344× QSFP-100G-CWDM4-S=—optics counts derive from the port plan, not chassis headcount.
- Four silent misses sink N9K RFQs: NX-OS vs ACI mode, PI fan trays, region power cords, and the Smart Account required before NX-OS image download.
- No unit prices or EXW subtotals are published; every lead-time figure is an industry estimate pending written channel confirmation.
Fit: data-center expansions that can share a port diagram, multi-vendor scorecards, teams that must prove optics integrity before PO. Unfit: single-line total shootouts with no part list; projects that refuse Smart Account prep when software lines mark it mandatory; buyers who want this page to republish workbook money figures.
Evidence table: chassis, accessories, optics (quantities, not money)
Line counts below come from a desensitized 2026-08-18 structure. Re-validate before purchase order. Lead days = industry estimate / pending confirmation.
| Block | SKU spine | Qty pattern | Est. lead* | RFQ gate |
|---|---|---|---|---|
| Chassis A | N9K-C9336C-FX2 | ×24 | ~28 days | 36p QSFP28; CON-SNT-N9336FX2 ×24 (12 mo) |
| A fans / AF | NXA-FAN-65CFM-PI + NXK-AF-PI | ×72 / ×24 | ~14 days | Port-side intake only |
| A PSU / cords | NXA-PAC-750W-PI + CAB-250V-10A-CN | ×48 / ×48 | ~14 / ~7 days | Region cords must match PDU |
| Chassis B | N9K-C9364C-GX | ×56 | ~42 days | 64p QSFP28; CON-SNT-N9KC93CG ×56 (12 mo) |
| B fans | NXA-FAN-160CFM2PI | ×224 | ~14 days | Do not reuse 65CFM PIDs |
| B PSU / RMK | NXA-PAC-2KW-PI + N9K-C9300-RMK | ×112 / ×56 | ~42 / ~7 days | CN cords ×112 |
| Software | NXOS-CS-10.6.1F | ×80 (24+56) | ~21 days | Smart Account Mandatory = Yes |
| Mode | MODE-NXOS | ×80 | ~21 days | This BOM = NX-OS, not ACI |
| Optics | QSFP-100G-CWDM4-S= | ×1344 | ~17 days | Port-plan driven |
Hard numbers for the RFQ appendix: 80 chassis; 1344 CWDM4 optics; 72 / 224 fans by family; 160 CN power cords (48+112). A logistics footnote on the estimate also referenced a 42+30 days style channel note—still industry estimate / pending confirmation. Sample FOB point printed as None; do not invent Incoterms on the public page.
Versus view: shootout without structure vs equal-BOM RFQ
| Dimension | Broken shootout | Equal-BOM RFQ |
|---|---|---|
| Fabric map | “About eighty switches” | FX2×24 + GX×56 with roles and port loads |
| OS mode | Verbal “NX-OS” | MODE-NXOS ×80 + NXOS-CS-10.6.1F written |
| Airflow | Missing fans or mixed PE | PI fans + NXK-AF-PI pairs |
| Power cords | Generic C13 filler | CAB-250V-10A-CN aligned to PSU counts |
| Optics | Guess from chassis count | Port diagram → CWDM4 qty (sample 1344) |
| Smart Account | Opened after delivery | Pre-PO when software marks Mandatory |
| Lead time | Paste estimate days into LD clauses | Written ATP + ship waves only |
| Commercials | Publish EXW totals | Money only on formal quote under NDA |
TaoHan integration teams see the failure mode repeatedly: chassis land on time, optics arrive late or short, CN cords are wrong for the PDU map. Equal-BOM tables belong in the tender pack—not in a chat thread.
How to run the five RFQ gates
- Freeze the fabric map. Align architecture on which roles the 9336C-FX2 and 9364C-GX play, how many QSFP28 ports each role consumes, oversubscription, and whether CWDM4’s ~2 km SMF assumption holds.
- Lock NX-OS mode. Require MODE-NXOS and NXOS-CS-10.6.1F. If a bidder mixes ACI mode lines or drops mode selection, force a corrected equal structure before scoring commercials.
- Equalize airflow and cords. For FX2: NXA-FAN-65CFM-PI ×72, NXA-PAC-750W-PI ×48, CAB-250V-10A-CN ×48. For GX: NXA-FAN-160CFM2PI ×224, NXA-PAC-2KW-PI ×112, CAB-250V-10A-CN ×112, N9K-C9300-RMK ×56. Airflow must match the live floor.
- Gate optics integrity. Validate QSFP-100G-CWDM4-S= against the port plan (sample 1344). Red-flag quotes that slash optics without a written statement of which ports use DAC or another optic type.
- Prep Smart Account and SNTC. Treat Smart Account Mandatory software lines as pre-PO work. Write CON-SNT-* months (sample 12). Keep channel selection lines such as DCN-OTHER, C1-SUBS-OPTOUT, and MEM-UPG-OPT-OUT per valid config rules—do not delete them casually and invalidate the estimate.
Only after these gates should finance discuss payment milestones. Any EXW or channel total stays on the formal quote. Treat 28 / 42 / 17 day estimate fields and any 42+30 day logistics note as industry estimate / pending confirmation until ATP letters arrive.
Buyer personas: who owns which gate
- Network architecture: Own the port map and whether optics ship with chassis in the same PO window.
- Facilities / power-cooling: Own PI airflow and whether 2KW PSU plus CN cord counts match PDU density.
- Procurement scorecard owner: Own equal-BOM enforcement—reject “cheaper” bids that silently cut CWDM4 lines or swap ACI/NX-OS.
If each role keeps a private spreadsheet, rack week will disagree. Keep one BOM truth file; procurement only updates confirmation columns for quantity and lead time.
Failure modes that show up before PO
- Cutting 1344 optics down to “a few hundred” because chassis count is 80—then lighting only a fraction of the fabric.
- Mixing 65CFM and 160CFM fan PIDs across FX2 and GX families.
- Saying NX-OS verbally while the BOM omits MODE-NXOS or injects ACI selectors.
- Shipping non-CN cord SKUs into a PRC PDU environment.
- Discovering Smart Account Mandatory only during image download week.
- Writing estimate days into liquidated-damages clauses without channel ATP.
- Pasting unit prices or EXW subtotals into public materials.
Fit / unfit boundary
Fit to run this equal-BOM path: projects already on Cisco Nexus 100G QSFP28, able to share a leaf/spine port diagram, willing to write chassis / fans / PSUs / optics / mode as verifiable lines, and ready for written ATP plus Smart Account process.
Unfit to force-fit: designs that must leave Cisco fabric brands without a cross-vendor equal map; media/distance that does not suit CWDM4 (very short DAC or long-haul ZR) yet copy the 1344 sample; RFQs that demand a single total and refuse a part list—fix the scoring rules first, do not PO and reverse-engineer the BOM later.
Frequently asked questions
Why can optics quantity dwarf chassis count?
What happens if MODE-NXOS is missing?
Can we treat 28 / 42 / 17 lead days as contractual ATP?
How do we contact TaoHan for a Nexus equal-BOM review?
References
- Cisco Nexus 9000 Series Switches — vendor product family entry
- Nexus 9336C-FX2 support / model page — official model materials
- Cisco 100GBASE CWDM4 QSFP datasheet — public optics specifications
Related reading
Score the port map and optics line first
If you are preparing a domestic data-center Nexus 100G leaf/spine expansion, send chassis mix, port plan, and airflow/cord region to Shanghai TaoHan Industrial. We help equalize CWDM4 quantity with topology and confirm NX-OS / PI / CN cord sets before commercials—so chassis do not arrive with dark ports.
Contact TaoHan · Nexus equal-BOM reviewEmail: info@021taohan.com