FortiGate 81E End of Support and Nine Fortinet Lifecycle Dates: How China Government and Enterprise Tenders Should Split Replace vs Spare

Nine models · replace vs spare · deviation table · 13% VAT

Home / News / FortiGate 81E End of Support

中文版:FortiGate 81E 停服:九款换型与备件招标

Definition: End of Order (EoO) is the last day Fortinet accepts new product orders. End of Support (EoS) is the final milestone, after which Fortinet has no obligation to provide support services. Last Service Extension Date (LSED) is generally twelve months before EoS. Hardware EoS is generally about sixty months after EoO.
Dates verified from Fortinet's Hardware Product Lifecycle RSS (`support.fortinet.com/rss/Hardware.xml`, channel lastBuildDate 2026-10-16 Pacific; page checked 2026-10-23 Asia/Shanghai). Milestone definitions follow Fortinet's community Product Life Cycle tip. This page has no prices, is not a price list or offer, and makes no brand-authorisation claim. Tender and tax wording below is common practice, not legal advice.
Key points

Between 2026-10-29 and 2026-11-14, nine Fortinet hardware models hit a lifecycle milestone. Four reach End of Support and should be treated as replacement projects: FortiDeceptor-1000F, FortiAuthenticator-2000E, FortiAuthenticator-3000E and FortiGate-81E. Five reach End of Order only and remain supported into 2031: FortiAP-432FR, FortiSwitch-424E-FPOE, FortiADC-220F, FortiAnalyzer-300G and FortiManager-200G — so the near-term buy is spares or a last identical order. For China government and enterprise tenders, also align the deviation table, the ceiling price package, and the usual 13% special VAT invoice requirement.

How do you verify the nine models and dates?

The table below is taken from Fortinet's official Hardware RSS, checked on 2026-10-23. Before you freeze a tender or purchase order, re-check each exact suffix in Fortinet's Product Life Cycle portal (Hardware & VM tab). The portal UI is authoritative; RSS and third-party sites can lag.

Model Milestone in window EoO LSED EoS Source
FortiDeceptor-1000F EoS 2021-10-29 2025-10-29 2026-10-29 Hardware RSS
FortiAuthenticator-2000E EoS 2021-10-31 2025-10-31 2026-10-31 Hardware RSS
FortiAuthenticator-3000E EoS 2021-10-31 2025-10-31 2026-10-31 Hardware RSS
FortiGate-81E EoS 2021-11-14 2025-11-14 2026-11-14 Hardware RSS; last SW 7.4.0
FortiAP-432FR EoO 2026-10-29 2030-10-29 2031-10-29 Hardware RSS
FortiSwitch-424E-FPOE EoO 2026-10-29 2030-10-29 2031-10-29 Hardware RSS; -TAA same dates
FortiADC-220F EoO 2026-11-01 2030-11-01 2031-11-01 Hardware RSS
FortiAnalyzer-300G EoO 2026-11-01 2030-11-01 2031-11-01 Hardware RSS
FortiManager-200G EoO 2026-11-01 2030-11-01 2031-11-01 Hardware RSS

Suffixes matter. FortiGate-81E-POE and FortiGate-81E-USG are separate RSS rows with later EoS dates (2027-07-15 and 2027-05-30). FortiDeceptor-1000F-USG lists EoS 2029-01-29. The string on the label decides whether a unit is in this window.

Why must EoS and EoO be separate lines in a China tender?

Factor Four EoS models Five EoO models
What stops Vendor support obligation after EoS New factory orders after EoO
Renewal path LSED already passed in 2025 Plan toward LSED/EoS around 2030/2031
Primary buy Replacement and migration Cold spare / last identical buy
Urgency High Medium (inventory risk)
Suggested tender label "Replace — EoS date" "Spare / last buy — EoO date"

A common mistake is to write "end of sale" as if it meant "stop using immediately", or to mix replace and spare lines in one package without labelling the milestone. Evaluators then either force a full refresh where a spare would do, or leave an EoS firewall on a renewal path that no longer exists. Split the response columns in the deviation table.

Deviation table, ceiling price and 13% special VAT invoice

The following is common practice on China government and enterprise informatization projects. It is not legal advice. Always follow the current tax rules, the tender file, and finance or audit requirements.

  • Deviation table: Write capabilities such as "cutover before EoS" and "spare must match the installed suffix and be registrable for support". Do not hard-bind an unverified successor part number. "Or equivalent" language is common; require a comparison matrix (throughput, ports, HA, licences).
  • Ceiling price: If replace and spare sit in different packages, the ceiling must match the package scope. Mismatched FortiCare years make bids incomparable. Bids above the ceiling are usually invalid under the tender rules — confirm in the file.
  • 13% special VAT invoice: Hardware goods quotes commonly settle on a 13% special VAT invoice. State whether software licences and hardware are invoiced separately, the tax-inclusive price, the rate, and the invoicing entity. Rates follow the State Taxation Administration and the contract.
  • Domestic delivery and acceptance: Name the delivery site, cutover window, disposition of retired units if required, serial-number handover, and who registers support. Any cross-border supply path is a factual matter for the contract, not expanded on this page.

TAOHAN (Shanghai TaoHan Industrial Co., Ltd.) typically inventories serials and suffixes first, splits "replace package / spare package" RFQs second, and only then drafts wording that can enter a tender.

What if support already cannot extend past EoS? How to prioritise?

For the four EoS appliances, LSED closed in 2025, so a Fortinet-path renewal past EoS is not available. Practical steps:

  1. Confirm whether production still depends on the chassis — especially internet-facing FortiGate-81E and identity FortiAuthenticator units.
  2. Rank cutover windows by business impact, not by which box arrives first.
  3. Collect orderable options against your own throughput, port, HA and licence matrix; require written confirmation. This page does not invent official successor SKUs.
  4. Treat any channel trade-up matrix as secondary until it is checked against Fortinet's portal and your serial numbers.

For the five EoO models, prioritise lines with no cold spare, multi-site identical SKUs, and sensitive lead times. Units that already have spares can sit on the normal CapEx calendar toward 2030 LSED / 2031 EoS.

What belongs on the replace-or-spare RFQ?

Suggested fields for the inquiry letter:

  • Exact model suffix and serial numbers (for example FortiGate-81E, not a vague "81E family")
  • Current FortiCare / FortiGuard expiry per unit
  • Milestone type: EoS or EoO, with the verification date and source
  • Intent: replace, cold spare, or last identical buy for multi-site rollout
  • For replace: inspected throughput target, interface mix, HA, licence years
  • For spare: quantity, registration name, planned retirement year
  • Delivery site, acceptance terms, special VAT invoice requirement, quote validity

Do not ask bidders to guess a successor. Ask them to map orderable SKUs to your matrix and confirm supply and support registration in writing. Any verbal industry figure is an industry estimate, pending confirmation. This site does not publish prices.

Who is this for, and who is it not for?

Useful for:

  • China government and enterprise owners running any of the nine models who must budget in late 2026 or early 2027
  • Tender agents and integrators who must encode EoS / EoO into specifications and deviation tables
  • Buyers who need to split replace and spare packages and align 13% special VAT invoice wording

Not for:

  • Readers who want an invented list of unpublished successor part numbers or a public price list
  • Readers who only need FortiOS software calendars with no hardware SKU in this window
  • Anyone treating this page as legal, tax or vendor commitment

Six implementation steps

  1. Export installed Fortinet serials and copy the full model string from each label.
  2. Tag each unit: EoS in this window, EoO in this window, later suffix variant (for example 81E-POE), or out of scope.
  3. Re-confirm EoO, LSED and EoS in Fortinet's Product Life Cycle portal; keep a dated export or screenshot.
  4. Issue two RFQs: "Replace — EoS" and "Spare / last buy — EoO".
  5. On replace lines, write a capability matrix only; require orderable mappings and forbid unverified trade-up names as mandatory clauses.
  6. Equalise support years, note that no contract extends past EoS, and set quote validity to cover internal approval.

FAQ

When is FortiGate-81E end of support?
Fortinet's Hardware RSS lists End of Support for FortiGate-81E on 2026-11-14, with EoO 2021-11-14, LSED 2025-11-14, and last supported software version 7.4.0. Check the suffix; 81E-POE and 81E-USG have later dates.
Is FortiAuthenticator-2000E at EOL?
The Hardware RSS lists End of Support for FortiAuthenticator-2000E on 2026-10-31 (same dates as 3000E). After EoS, Fortinet's published wording is that it has no obligation to provide support services.
Can FortiAP-432FR still be used after end of order?
Yes. EoO on 2026-10-29 stops new factory orders; the RSS lists support through 2031-10-29. Near-term work is spares and last identical buys, not an automatic rip-and-replace.
Can FortiCare be extended after EoS?
Under Fortinet's definitions, LSED is the last day an extension is accepted, and no service contract may run past EoS. For the four EoS models in this window, LSED already passed in 2025.
May a tender hard-code one successor model?
This page does not publish unverified successors. Write capabilities and a comparison matrix; let bidders respond with "or equivalent" and attach written vendor or channel confirmation. Common practice, not legal advice.
Does TAOHAN issue 13% special VAT invoices?
Domestic goods projects commonly settle on a 13% special VAT invoice; the written quotation and contract govern.

References

Contact TAOHAN

Send installed serial numbers, exact model suffixes, and whether each line is replace (EoS) or spare / last buy (EoO). Shanghai TaoHan Industrial Co., Ltd. (TAOHAN) will reply against confirmed, orderable part numbers only.

Contact TAOHAN · security lifecycle RFQ

Email: info@021taohan.com

This site does not publish prices. All prices are by written quotation only; any figure not confirmed in writing is an industry estimate, pending confirmation.