HPE Gen11 LOT3 Equal-BOM: Freeze Face A vs Face B

2× DL360 8SFF · 9× DL380 8SFF · 3× DL380 12LFF — CapEx RFQ gates (2026)

Home / News / HPE LOT3 RFQ

中文版:Gen11 LOT3 Face A/B 料号漂移漏配

HPE Gen11 LOT3 equal-BOM Face A versus Face B freeze gates
An HPE ProLiant Gen11 LOT3 package is a 14-chassis equal-BOM problem, not a single sticker: 2× DL360 Gen11 8SFF, 9× DL380 Gen11 8SFF, and 3× DL380 Gen11 12LFF. Channel packs often ship two faces in parallel—Face A (Europe Multilingual B19 with Gold 6542Y / 6548Y+) versus Face B (China #AKM with 6418H / 6558Q). CapEx fails when buyers treat localization as a silent swap while CPU, DIMM speed, RAID backup, NVMe (P84239 vs P70436), and heatsinks already drifted. No unit, extended, or lot totals are published here. Lead signals stay industry estimate / pending confirmation.
Disclaimer: Structure is distilled from a desensitized channel BOM workbook (context 21-Aug-2026). Opportunity and customer fields are stripped. This is procurement hygiene—not a price list or binding offer. Final SKUs, ATP, warranty, and firmware compatibility require written confirmation.

What LOT3 means as a CapEx object

LOT3 is a multi-chassis lot that binds compute and capacity nodes into one RFQ. Chassis anchors are P52499-B21 ×2, P52534-B21 ×9, and P52533-B21 ×3. Shared fabric rows typically include Broadcom BCM57414 10/25Gb OCP3 (P10115-B21), 25Gb SFP28 SR optics (845398-B21), iLO Advanced (BD505A), and dual 1600W Flex Slot PSUs (P38997-B21) per chassis. Drive classes (SAS RI/MU and LFF) can look identical across faces—yet the ad-hoc NVMe line is where part numbers fork.

Key takeaways
  • The Gen11 LOT3 package is 14 chassis: 2× DL360 Gen11 8SFF, 9× DL380 Gen11 8SFF, 3× DL380 Gen11 12LFF—rank quotes only after one face is frozen.
  • Face A (Europe Multilingual B19, Gold 6542Y / 6548Y+) and Face B (China #AKM, 6418H / 6558Q) can share chassis SKUs while CPU, DIMM speed, RAID backup, NVMe, and heatsinks drift.
  • The 60–90 day lead-time band is an industry estimate pending confirmation; bind only written ATP dates and penalties in contracts.

Fit: buyers who must shortlist two channel quotes on an equal BOM before CapEx freeze, with domestic rack integration cadence. Unfit: teams that compare chassis nets only, treat #AKM as a translation of B19, or insist on locking soft lead days as unchangeable ATP.

Numbers that must appear on every RFQ (no money)

Quantities below are structural only. Row lead days printed on estimates (often 14 / 4 / 8 / 3 / 1) and a footer band of about 60–90 days are soft—label them pending confirmation.

BlockSKUQtyRole
DL360 Gen11 8SFFP52499-B2121U compute / control
DL380 Gen11 8SFFP52534-B2192U primary compute / SAS
DL380 Gen11 12LFFP52533-B213Capacity LFF
15.36TB SAS RI SFFP49045-B2112+90DL360 ad-hoc + DL380 8SFF
3.2TB SAS MU SFFP49053-B214DL360
3.84TB SAS MU SFFP40512-B2118+6DL380 8SFF + 12LFF stacking
16TB SAS 7.2K LFFP23608-B2142DL380 12LFF
NVMe ~15.36TB ad-hocFace-specific30P84239 vs P70436
25Gb optics845398-B214+18+6Port-plan integrity
Lead signal~60–90 days—Industry estimate / pending confirmation

If chassis counts change, SAS, optics, and PSU multipliers must move in the same revision—otherwise the RFQ is already unequal.

Face A vs Face B drift matrix

This comparison is the CapEx gate. Face A tracks a GPL-style estimate with Europe Multilingual B19. Face B tracks China localization #AKM. Same chassis SKUs do not mean equal performance or spare paths.

DomainFace AFace B
LocalizationEurope Multilingual B19China - English #AKM
DL360 CPUXeon Gold 6542Y P67081-B21 ×4Xeon Gold 6418H P49621-B21 ×4
DL380 CPUXeon Gold 6548Y+ P67082-B21 ×18+6Xeon Gold 6558Q P67098-B21 ×18+6
DL360 DIMMDDR5-5600 64GB P64707-F21 ×8DDR5-4800 64GB P43331-F21 ×8
DL360 RAIDMR408i-o P58335-B21 + hybrid cap P02377-B21MR216i-o P47789-B21 (no hybrid-cap line)
DL380 RAID backupHybrid capacitor P02377-B2196W Smart Storage Battery P01366-B21
NVMe ad-hocP84239-B21 ×30P70436-B21 ×30
DL360 OCP enableP51911-B21P48830-B21 (CPU2/OCP2)
DL380 heatsinkHigh Perf P48818-B21 ×18+6Max Perf P48817-B21 ×9+3

TaoHan’s equal-BOM rule: if any drift row differs, the quotes are two products. Ranking them as “same LOT3” is a CapEx error, not a negotiation tactic.

How to run the RFQ (five gates)

  1. Step 1 — Name the Face on the cover. Bold Face A or Face B before any net comparison. Ban “quote A / ship B.”
  2. Step 2 — Lock chassis quantities. Confirm 2 / 9 / 3 for P52499 / P52534 / P52533 and regenerate drive and optic rows if counts change.
  3. Step 3 — Diff every drift domain. CPU (6542Y/6548Y+ vs 6418H/6558Q), DIMM speed, RAID backup chemistry, NVMe part, OCP enablement, heatsink kit—any mismatch fails the equal-BOM gate.
  4. Step 4 — Bind media and optics. Keep P49045 / P49053 / P40512 / P23608 and 845398 on the same PO; missing optics stalls fabric bring-up.
  5. Step 5 — Soft-label logistics. Treat printed lead days and 60–90 day footers as industry estimates pending confirmation; only written ATP enters the contract.

Only after the five gates should finance compare commercial terms. Untagged Face swaps invalidate the shortlist.

Buyer personas and decision tree

  • Integration owner: prioritize rails, PSUs, LFF front Tri-Mode cable (P56995-B21), and optic co-arrival with chassis.
  • Platform owner: prioritize CPU core/clock and DIMM speed for benchmark baselines—do not assume Face B 4800 equals Face A 5600.
  • Ops owner: prioritize RAID backup spare path (hybrid capacitor vs 96W battery), iLO Advanced start, and ban mixed-face nodes in one production pool.

Decision tree in one line: same chassis SKUs → check Face → if drift exists, either freeze one face or reopen the technical annex—never average the two quotes.

Failure modes before rack week

  • Treating identical chassis SKUs as proof of equal BOM.
  • Reading #AKM as a language option for B19 instead of a localization config string.
  • Ordering SAS only and forgetting the 30-drive NVMe ad-hoc line.
  • Shipping controllers without the matching capacitor or battery kit.
  • Mixing High Perf and Max Perf heatsink qty assumptions across faces.
  • Writing soft 60–90 day bands into liquidated-damages clauses as hard ATP.

Fit / unfit boundary

Fit when the project truly needs this 14-chassis Gen11 mix, can freeze one Face before CapEx, and can co-bind disks and optics on one PO.

Unfit when Face A performance language is mandatory but only Face B localization is orderable without rewriting acceptance scripts; when required delivery is far inside the soft window with no alternate ATP; or when policy forbids any channel config drift—change the technical annex first.

FAQ

Can we rank Face A and Face B quotes as equal BOM?
No. Chassis SKUs can match while CPU, DIMM speed, RAID backup, NVMe, OCP enablement, and heatsinks diverge. Freeze one face before CapEx ranking.
Is P70436 a drop-in for P84239?
Both are ~15.36TB-class NVMe ad-hoc lines at qty 30, but different part numbers. Treat capacity-only swaps as a BOM break unless the channel confirms firmware and warranty in writing.
Can 60–90 days be locked as ATP?
No. That band is an industry estimate pending confirmation. Contracts should bind only written ATP dates, staged ship rules, and penalties.
How do we RFQ TaoHan on LOT3?
Send the frozen Face, rack plan, and target week to info@021taohan.com or the Contact page. TaoHan replies on domestic delivery and integration cadence without publishing unverified list prices.

References

Freeze the Face before CapEx

If you are shortlisting HPE Gen11 LOT3 channel quotes, send TaoHan the candidate BOMs with Face tags. We help confirm whether 6542Y/6548Y+ versus 6418H/6558Q and P84239 versus P70436 are still the same product—before finance ranks nets.

Contact TaoHan · LOT3 equal-BOM check

Email: info@021taohan.com