November 30, 2026 (2026-11-30) is the End of Support / End of Service (EOS) milestone for the Lenovo ThinkSystem DM7000F (7Y40) all-flash array and ThinkSystem DM7000H (7Y56) hybrid storage array—not the withdrawal-from-marketing date, which passed years ago. Because Lenovo's announced EOS dates can vary by geo (including the PRC EOS Announcement Report), always re-verify your exact machine type and serial numbers in Lenovo's official End of Service Date Lookup. When planning a same-family refresh, note that DM7100F (7D25) was withdrawn from marketing on 2025-11-30 per LP1271; late-2026 all-flash tenders should evaluate the current 2U all-NVMe ThinkSystem DM7200F (7DJ3), while hybrid workloads evaluate DM7100H (7D26) or NVMe plus FabricPool tiering.
What does 2026-11-30 mean for DM7000F (`7Y40`) and DM7000H (`7Y56`), and how do you verify it in Lenovo's lookup?
Before drafting a Q4 2026 or Q1 2027 storage budget, distinguish between ordering cutoffs and service termination. 2026-11-30 is the End of Support (EOS) date for ThinkSystem DM7000F (7Y40) and DM7000H (7Y56), not the End of Sale date. Per Lenovo Press LP0912 and LP0886, both 7Y40 and 7Y56 are already withdrawn from marketing.
On Lenovo's official End of Service Date Lookup for Servers/Storage/Networking products (support.lenovo.com/us/en/solutions/endofservice and datacentersupport.lenovo.com), Lenovo states three key rules for storage owners:
- Geo-specific verification (including PRC): Announced EOS dates vary by region (
NA,EMEA,LA,AP, and the dedicated PRC EOS Announcement Report for mainland China). Enter machine type7Y40or7Y56and your model code (CTO1WW) to verify your local date. - Five-year support baseline: Lenovo has historically provided support for at least 5 years (60 months) after withdrawal from marketing, posting EOS dates at least 90 days in advance.
- Reasonable commercial endeavors post-EOS: Lenovo states that in some cases it will use reasonable commercial endeavors to maintain eligible products beyond EOS, depending on local machine population, spare parts, and skilled engineer availability.
Verified baseline numbers: DM7000F (`7Y40`) and DM7000H (`7Y56`) specifications
When building a domestic tender specification or a maintenance bridge inquiry, use the verified figures from Lenovo Press LP0912 and LP0886 below (no prices are published on this page):
| Attribute | ThinkSystem DM7000F All-Flash (LP0912) | ThinkSystem DM7000H Hybrid (LP0886) |
|---|---|---|
| Controller machine type & CTO base | 7Y40 (7Y40CTO1WW, chassis B38K, controller B39H) |
7Y56 (7Y56CTO1WW, chassis B38K, controller B39H) |
| Controller enclosure form factor | 3U rack mount (dual active-active HA pair, 0 internal drives) | 3U rack mount (dual active-active HA pair, 0 internal drives) |
| Memory & NVRAM per HA pair | 256 GB RAM (128 GB/ctrl) + 16 GB mirrored NVRAM (8 GB/ctrl) | 256 GB RAM (128 GB/ctrl) + 16 GB mirrored NVRAM (8 GB/ctrl) |
| Onboard NVMe Flash Cache | None (all-flash array) | 4 TB NVMe Flash Cache (2 TB per controller) |
| HA / cluster interconnect ports | 4x 10 GbE SFP+ (2 ports per controller) | 4x 10 GbE SFP+ (2 ports per controller) |
| Base host ports (per 3U enclosure) | 8x 1/10 GbE or 4/8/16 Gb FC SFP+ plus 4x 1/10 GbE RJ-45 | 8x 1/10 GbE or 4/8/16 Gb FC SFP+ plus 4x 1/10 GbE RJ-45 |
| Optional adapter card host ports | 10 GbE, 40 GbE QSFP+, 25 GbE iWARP (MCC-IP), 8/16/32 Gb FC | 10 GbE, 40 GbE QSFP+, 25 GbE iWARP (MCC-IP), 8/16/32 Gb FC |
| Supported 12 Gb SAS expansion shelves | Up to 16x DM240S 2U24 SFF (7Y58, 7D7Y) |
Mix of DM240S (7Y58), DM120S 2U12 (7Y59), DM600S 4U60 (7Y43) |
| Max drives & max raw capacity | Up to 384 SFF 12 Gb SAS SSDs / up to 5.89 PB raw | Up to 480 LFF/SFF drives / up to 7.68 PB raw |
| Max random read IOPS (8 KB blocks) | Up to 350,000 random read IOPS | Up to 350,000 random read IOPS |
| PRC software bundle feature codes | Unified Base (B5RH, PRC only) or Unified Premium (B5RJ) |
Unified Base (B5RH, PRC only) or Unified Premium (B5RJ) |
Same-family refresh: why evaluate DM7200F (`7DJ3`) alongside DM7100F/H (`7D25`/`7D26`)?
Older Lenovo product guides point from DM7000F/H to DM7100F/H, but a 2026 lifecycle check shows why tender writers must look one generation further for all-flash arrays:
- DM7100F (
7D25) was withdrawn from marketing on 2025-11-30: Lenovo Press LP1271 (updated January 12, 2026) states that the ThinkSystem DM7100F is withdrawn from marketing effective 11/30/2025. Do not lock a late-2026 new-equipment tender onto a withdrawn7D25MTM. - DM7200F (
7DJ3) is the current all-NVMe replacement target: Lenovo Press LP2075 (updated October 26, 2026 for ONTAP 9.19) covers the ThinkSystem DM7200F (7DJ3,7DJ3CTO1WW), a 2U all-NVMe unified array with 24 internal U.2 NVMe bays, 256 GB RAM, 32 GB NVMEM, expansion up to 120 NVMe SSDs via DM242N (7DJ8) 100 GbE RoCE shelves, and up to 139% higher performance than the DM7100F. - Hybrid capacity options (
DM7100H7D26or FabricPool tiering): LP0886 names the 4U ThinkSystem DM7100H (7D26, LP1270, up to 720 drives / 10.95 PB) as the hybrid replacement. Confirm current regional CTO availability of7D26in writing, or pair an all-NVMe DM7200F (7DJ3) / DM5200F (7DJ2) hot tier with ONTAP FabricPool object tiering.
| Comparison Item | Legacy Estate: DM7000F (7Y40) / DM7000H (7Y56) |
Prior Gen: DM7100F (7D25) / DM7100H (7D26) |
Current All-NVMe: DM7200F (7DJ3, LP2075) |
|---|---|---|---|
| Status in Oct 2026 | Withdrawn; EOS on 2026-11-30 | DM7100F withdrawn 2025-11-30 (LP1271); DM7100H per LP1270 | Active all-NVMe lineup (LP2075 updated 2026-10-26) |
| Controller form factor | 3U controller enclosure (no internal drive bays) | 4U controller enclosure (no internal drive bays) | 2U controller + 24 internal NVMe SFF bays |
| Memory & NVRAM per HA pair | 256 GB RAM + 16 GB NVRAM (plus 4 TB cache on 7000H) | 256 GB RAM + 32 GB NVRAM (plus 4 TB cache on 7100H) | 256 GB RAM + 32 GB NVMEM |
| Drive media & expansion shelf | 12 Gb SAS (DM240S 7Y58, DM120S 7Y59, DM600S 7Y43) |
NVMe (DM240N 7Y62) or 12 Gb SAS shelves |
End-to-end NVMe with DM242N (7DJ8) 100 GbE shelves |
| Host Fibre Channel options | 4/8/16 Gb FC base; optional 8/16/32 Gb FC cards | 16 Gb FC mezz; optional 8/16/32 Gb FC cards | 4-port 16/32/64 Gb FC HICs (4XC7A97031) |
| Host Ethernet options | 1/10 GbE base; optional 10/40 GbE, 25 GbE iWARP | 25 GbE mezz; optional 10GBASE-T, 10/25/40/100 GbE | 10GBASE-T, 10/25 GbE SFP28, 40/100 GbE HICs |
| Power supplies & voltage | 2x 1460 W Platinum (100–240 V AC) | 4x 1600 W Platinum (100–240 V AC) | 2x 1600 W Titanium (200–240 V AC on DM7200F) |
Post-EOS support bridge vs hardware refresh: how should China tenders compare them?
| Decision Dimension | Option A: Short-Term Post-EOS Support Bridge (Renew) | Option B: Hardware Refresh to DM7200F (7DJ3) / Equivalent |
|---|---|---|
| Best-fit timing | 3–12 month bridge ahead of a 2027 data hall move or app retirement | Core SAN/NAS workloads needing 3–5 years of guaranteed SLA |
| Support certainty | Subject to Lenovo commercial endeavor and regional parts stock after 2026-11-30 | Full 3-to-5-year Foundation, Essential (24x7 4-hr), or Premier warranty |
| Existing 12 Gb SAS shelves | Retains 7Y58/7Y59/7Y43 shelves in place during the bridge |
Migrates volumes over the network via ONTAP SnapMirror to NVMe |
| PRC ONTAP software bundle | Existing Unified Base (B5RH) or Unified Premium (B5RJ) |
Unified Essentials (BWU9) or Unified Complete (BWU8) with NonEncryption code |
| Domestic tender & 13% VAT | Maintenance service contract; verify service tax rate and back-to-back SLA | Hardware goods tender commonly settled on a 13% special VAT invoice |
Six-step RFQ and deviation-table checklist for DM7000F/H refresh or renewal
- Step 1 — Export controller and shelf serials and MTMs: List the 4-character machine types (
7Y40or7Y56) and serial numbers for all 3U controllers and attached7Y58,7Y59, and7Y43expansion enclosures. - Step 2 — Check Lenovo's EOS Lookup / PRC report: Confirm the exact regional EOS date for every serial number and save the lookup record for your tender audit file.
- Step 3 — Audit usable capacity and the 68 TB DM7200F minimum: Sum your active SAS SSD and NL SAS HDD capacity. Note that DM7200F (
7DJ3) requires a minimum of 8 NVMe drives and 68 TB raw capacity per HA pair, and legacy 12 Gb SAS shelves (SFF-8644) cannot attach directly as NVMe expansion shelves—plan an ONTAP SnapMirror migration window. - Step 4 — Check host HIC ports and fixed-speed Ethernet SFPs: Map your 16/32 Gb FC and 10/25/40/100 GbE switch ports. On DM7200F (
7DJ3), HICs are ordered in pairs (up to 6 per HA pair), FC HICs require separate SFP+ transceivers, and Ethernet SFPs run at posted speed only without dual-rate auto-negotiation. - Step 5 — Select PRC-compliant ONTAP bundles and NonEncryption codes: If the project needs SnapMirror replication, SnapVault, SnapCenter, or SnapLock, specify Unified Complete (
BWU8) rather than Unified Essentials (BWU9). For mainland China deployments, select the matching NonEncryption ONTAP feature code (e.g., ONTAP 9.18CF4Tor ONTAP 9.19CKK0) and note that LP2075 marks TPM support as not available in PRC. - Step 6 — Align deviation tables, 200–240 V rack power, and 13% VAT: State in the tender deviation table that DM7200F requires 200–240 V AC rack PDUs, use capability matrices with "or equivalent" wording where required, and specify tax-inclusive CNY pricing with a 13% special VAT invoice (common practice, not legal advice).
Typical deployment scenarios and use cases for DM7000 lifecycle projects
- Scenario 1 — Core database, virtualization, and hospital HIS all-flash refresh (
7Y40to7DJ3): Replacing a 3U7Y40plus multiple 2UDM240SSAS shelves with a single 2U DM7200F (7DJ3) populated with 24 NVMe SSDs and 32/64 Gb FC HICs shrinks rack footprint and removes the 2026-11-30 support cliff. - Scenario 2 — Multi-petabyte hybrid NAS/SAN archive (
7Y56withDM600S4U60 shelves): Enterprises running 4 TB to 16 TB NL SAS HDDs in7Y434U60 enclosures can split hot tier workloads onto an all-NVMeDM7200F/DM5200Fwhile tiering cold snapshots via ONTAP FabricPool or verifyingDM7100H(7D26) CTO availability. - Scenario 3 — Dual-site SnapMirror DR and MetroCluster IP upgrades: When two data centers replicate between
7Y40arrays, check ONTAP cross-version SnapMirror interoperability in the Lenovo Storage Interoperation Center (LSIC) before refreshing the DR target first and the primary site second. - Scenario 4 — Short 6-month maintenance bridge before a 2027 facility migration: If a data center lease ends in mid-2027, request a serial-level post-EOS support check for the existing
7Y40/7Y56while delivering the new7DJ3array directly to the new site.
Who is this for, and who is it not for?
Suitable for:
- Enterprise and government IT owners in China running ThinkSystem DM7000F (
7Y40) or DM7000H (7Y56) arrays approaching 2026-11-30 - Integrators and tender teams writing technical specifications, deviation tables, and 13% VAT commercial schedules for DM Series storage refreshes
- Storage architects checking why DM7100F (
7D25) is withdrawn and how DM7200F (7DJ3) differs on shelves, HICs, and ONTAP bundles
Not suitable for:
- Readers seeking published list prices or unverified price estimates
- Teams expecting to daisy-chain 12 Gb SAS
DM240Sshelves directly onto an all-NVMeDM7200Fcontroller - Anyone treating general procurement and tax notes on this page as formal legal, tax, or vendor commitments
FAQ
Is 2026-11-30 the End of Sale or End of Support date for ThinkSystem DM7000F and DM7000H?
2026-11-30) is the End of Support / End of Service (EOS) date for Lenovo ThinkSystem DM7000F (7Y40) and DM7000H (7Y56), not the End of Sale date. Always re-confirm your specific serial numbers and region in Lenovo's End of Service Date Lookup or PRC EOS Announcement Report.Why should all-flash refresh tenders evaluate DM7200F (7DJ3) instead of DM7100F (7D25)?
7D25) was withdrawn from marketing on November 30, 2025 (2025-11-30). The ThinkSystem DM7200F (7DJ3, LP2075) is the current 2U all-NVMe replacement model and delivers up to 139% higher performance than the DM7100F.Can existing DM240S (7Y58) 12 Gb SAS shelves attach directly to a DM7200F (7DJ3)?
SFF-8644) expansion ports for DM240S SAS shelves, whereas DM7200F (7DJ3) houses 24 internal NVMe drives and expands via 100 GbE RoCE to DM242N (7DJ8) NVMe shelves. Migrate data between the old and new arrays using ONTAP SnapMirror.What PRC-specific ONTAP and hardware rules apply when bidding DM7200F in China?
BWU8) if SnapMirror, SnapVault, SnapCenter, or SnapLock is required (Unified Essentials BWU9 omits replication). Second, choose the NonEncryption ONTAP feature code (such as CF4T or CKK0) and note that TPM support is not available in PRC per LP2075. Third, Ethernet SFPs on DM7200F HICs run at posted speed only and do not auto-negotiate down.How does TAOHAN quote Lenovo storage refresh or renewal projects?
References
- Lenovo End of Service Date Lookup for Servers, Storage, and Networking Products (7Y40 / 7Y56)
- Lenovo Press LP0912: Lenovo ThinkSystem DM7000F Unified Flash Storage Array Product Guide (7Y40)
- Lenovo Press LP0886: Lenovo ThinkSystem DM7000H Unified Hybrid Storage Array Product Guide (7Y56)
- Lenovo Press LP1271: Lenovo ThinkSystem DM7100F Product Guide (7D25; withdrawn 2025-11-30)
- Lenovo Press LP1270: Lenovo ThinkSystem DM7100H Unified Hybrid Storage Array Product Guide (7D26)
- Lenovo Press LP2075 (updated 2026-10-26): ThinkSystem DM3200F, DM5200F and DM7200F Unified Storage Arrays (7DJ3)
- State Taxation Administration (chinatax.gov.cn)
- China Government Procurement Network (ccgp.gov.cn)
Related reading
Contact TAOHAN
Send your installed DM7000F (7Y40) or DM7000H (7Y56) serial numbers, attached expansion shelf models, FC/Ethernet port counts, and target usable TB. TAOHAN (Shanghai TaoHan Industrial Co., Ltd.) supplies Lenovo ThinkSystem storage sourced through authorized channels and will return a written quotation for your renewal bridge or DM7200F (7DJ3) refresh.
Email: info@021taohan.com
We do not publish prices. All pricing is by written quotation; unconfirmed figures are industry estimates, pending confirmation.