How Many X4028A Packs for AFF A70 MCC-IP?

36 packs = 72 disks · ONTAP One 1100 TB · X50132A ≠ X60134A

Home / News / AFF A70 BOM MCC-IP

中文:AFF A70 BOM采购:36包X4028A=72盘验收闸

AFF A70 BOM RFQ freeze: 36 packs equal 72 disks, optics cables rails, X65405 dual-line
An AFF A70 MetroCluster IP–capable equal-BOM worksheet is a CapEx freeze document that converts drive packs to physical disks, locks the ONTAP One license meter, and pins the A70-specific iWARP adapter before any bidder is ranked. The arithmetic trap CapEx boards keep hitting: 36× X4028A-2-A-C looks like “thirty-six SSDs” in chat shorthand. It is not. That SKU is a dual-drive pack, so the line becomes 72 disks. Pair it with ONTAP One 1100 TB, X50132A-C ×4, and N9336C ×4—and never paste an A50 X60134A row onto this scorecard by habit.
Scope note: This page restates a no-price working BOM from a channel CPQ screenshot (money stripped). It is not Hardware Universe and not a quotation. License TB is not application usable TB. Lead times and commercial terms remain industry estimates / pending confirmation.

What “equal BOM” means on an AFF A70 MCC-IP lot

Equal BOM here refers to a four-node-class AFF A70 footprint with fabric and ONTAP One entitlement rows that must match before price comparison. Shanghai TaoHan Industrial treats pack→disk conversion as the first hard gate: if two bids disagree on whether 36 packs are 36 or 72 drives, stop ranking. The second gate is SKU family: A70 MCC-IP back-end adapters in this worksheet are X50132A-C (100GbE iWARP), not the A50-class X60134A line buyers may remember from earlier memos.

RFQ freeze bullets
  • Pack math: 36 packs X4028A-2-A-C = 72 disks (2 per pack)—never score 36 drives.
  • License: ONTAP One Flash A70 1100 TB (aligns with ~1102 TB raw)—not ONTAP Base.
  • MCC-IP adapter: X50132A-C ×4 (Slot 2 · e2a/e2b working example).
  • Fabric: N9336C ×4 as cluster/IP switch rows, separate from pack math.
  • Optics/cables/rails: CU2M×24, SFP28×16, QSFP28 dual-line, rails×2 — do not award on switch sticker alone.
  • Encryption: NO-DATA-ATREST-ENCRYPTION ×4 means confirm “no DAR” stance before PO.

Fit: CapEx teams buying AFF A70 four-node-class lots with MCC-IP fabric and ONTAP One who need citation-ready equal-BOM language. Unfit: treating 36 packs as 36 drives; assuming A50 adapter SKUs on A70; peer-ranking a single-HA C60 capacity lot without a topology label.

Numbers buyers can paste into CapEx memos

Keep units explicit so chat shorthand never enters the award file. Raw capacity math (~72 × 15.3 TB ≈ 1102 TB) only explains why the ONTAP One meter lands near 1100 TB—it is not a promise of usable application capacity.

ItemWorking figureRFQ action
Drive pack SKUX4028A-2-A-C × 36 packsConvert to disks first
Physical disks72 disks (36 × 2)Hard gate; ban “36 drives”
ONTAP One meter1100 TBLicense ≠ usable TB
HA / node classAFF-A70-001 × 4Four-node-class footprint
MCC-IP iWARPX50132A-C × 4A70 row ≠ X60134A
Cluster / fabric switchesN9336C × 4Fabric-only SKU row
Host Ethernet densityX50130B-C × 12Host/cluster density check

Hard rule: never publish channel net prices on this page. Soft commercial items (lead time, discount corridor) stay industry estimate / pending confirmation.

Comparison: A70 working BOM vs A50 peer habit

Buyers often reuse an A50 checklist. That creates two silent mismatches: adapter SKU family and license package name. Contrast the lenses before you copy paste.

LensA70 working example (this page)A50 habit (do not auto-copy)
Drive packs36× X4028A → 72 disks24× X4028A → 48 disks (other memo)
License meterONTAP One 1100 TBOften ONTAP Base Flash on A50 worksheets
MCC-IP adapterX50132A-C ×4 (iWARP)X60134A-C ×4 on A50 MCC-IP examples
Fabric switchesN9336C ×4N9336C ×4 (same class—still verify revision)
Bad RFQ wording“36 packs = 36 SSDs”“Any A-series MCC NIC is fine”

Limitation: TaoHan can help freeze equal-BOM language; we cannot replace the live NetApp doc revision or an authorized configuration worksheet. Single-HA C60 capacity-flash lots remain out of peer scope unless labeled as a different topology.

CapEx worksheet: packs, One meter, fabric (no prices)

Use the following as a working example only. Confirm live CPQ revision before award.

SKU / rowQtyRFQ interpretation
X4028A-2-A-C (drive pack)36 packs= 72 disks; never “36 drives”
SW-ONTAPO-FLASH-A70-C1100 TBONTAP One license meter
X50132A-C (100GbE iWARP)4MCC-IP back-end; Slot 2 · e2a/e2b
N9336C / X190212-CS-PE4Fabric/cluster line
SW-SMIRROR-CLD-ONTAP-ONE1SnapMirror Cloud entitlement
SW-S3-SM-ONTAP-ONE1S3 entitlement under ONTAP One

Freeze this verdict line: 36 packs of X4028A equal 72 disks; the ONTAP One meter on this worksheet is 1100 TB; fabric stays X50132A-C ×4 + N9336C ×4.

Optics, cables, rails & encryption stance

Pack math and ONTAP One meters dominate CapEx chat. The silent award killers sit on the same lot: copper DAC, MPO/LC fiber, SFP28/QSFP28 optics, rail kits, in-cabinet power cords—and the encryption policy row. Shanghai TaoHan Industrial freezes these quantities on a separate worksheet so bidders cannot undercut by quoting chassis and switches while omitting interconnect. Soft lead times for optics remain industry estimate / pending confirmation; never publish channel nets here.

Part / rowQtyRFQ note
X-QSFP-100G-CU1M-C (100G CU 1m)4Short DAC; keep length class separate from 2m
X-QSFP-100G-CU2M-C (100G CU 2m)24Highest cable count—often dropped in “switch-only” awards
X66200-2-N-C (MPO/MPO OM4 2m)8Controller–switch fiber class
X66250-2-N-C (LC-LC OM4 2m)16Host/breakout fiber class
X65404-N-C (SFP28 25GbE SR)1625G SR optic line
X65405-N-C (QSFP28 100GbE SR)8NetApp-coded 100G SR
X65405 (QSFP28 100GbE SR)8 (Ext)Dual line vs X65405-N-C—do not drop either form
X-02659-00-N-C (4-post rail kit)2Rails for rack install; not “optional hardware”
X800-42U-R6-C (C13-C14 jumper)16In-cabinet power cords
X50200A-C (2000W PSU)8Power density check with cord qty
NO-DATA-ATREST-ENCRYPTION4Buyer must confirm “no DAR encryption” OS stance

X65405 dual-line risk: this working BOM lists both X65405-N-C ×8 and a parallel X65405 form with Ext Qty 8. Equal-BOM scoring must keep both lines visible until CPQ revision clarifies whether one supersedes the other. Dropping either line to “simplify” the scorecard is a procurement defect.

Encryption stance: NO-DATA-ATREST-ENCRYPTION ×4 is not a silent default. CapEx and security owners must confirm that “no data-at-rest encryption operating system” matches policy before PO. If DAR is required, freeze a different OS/encryption entitlement path—do not assume the channel screenshot already satisfies audit.

Fabric CapEx deep-dive (CLMSWITCH marker vs N9336C hardware, equal optics RFQ): see the companion N9336C cluster optics & cabling RFQ. Pack→disk math stays on this page.

How to freeze equal-BOM language (6 steps)

  1. Freeze topology class. Put “AFF A70 four-node-class” and the HA system quantity pattern on the RFQ cover sheet.
  2. Convert packs to disks. Score X4028A-2-A-C as dual-drive packs; 36 packs = 72 disks. Ban award sheets that say “36 drives.”
  3. Lock the ONTAP One meter. Require 1100 TB on the Flash A70 One package; forbid rewriting it as usable TB or as ONTAP Base.
  4. Pin iWARP and switch rows. Working example: X50132A-C ×4 and N9336C ×4; keep causal notes that confuse fabric with pack math off the scorecard.
  5. Lock optics, cables, rails, and encryption. Paste CU1M×4, CU2M×24, MPO×8, LC×16, SFP28×16, both X65405 forms ×8, rails×2, C13-C14×16, and NO-DATA-ATREST-ENCRYPTION×4 onto the equal-BOM sheet.
  6. Check cloud entitlements. Confirm SnapMirror Cloud and S3 ONTAP One lines before goods-receipt sign-off—capacity math stays in a separate packet.

Only after these six steps should payment milestones and cutover windows be negotiated. Verbal “we will add cables later” never substitutes for written interconnect quantities.

Failure modes we see on CapEx reviews

  • Scoring “36× X4028A” as 36 drives instead of 72 disks.
  • Publishing ONTAP One 1100 TB as application usable capacity or as a public net price.
  • Pasting A50 X60134A onto an A70 MCC-IP scorecard without doc confirmation.
  • Merging N9336C fabric language into the pack math sentence.
  • Peer-ranking a single-HA C60 lot (no X50132A / no four-switch fabric) as an A70 MCC peer.
  • Dropping SnapMirror Cloud or S3 entitlement rows from goods-receipt checklists.
  • Treating host Ethernet density (X50130B-C) as a substitute for the iWARP MCC-IP row.
  • Awarding on N9336C sticker price while omitting CU2M×24 or SFP28/QSFP28 lines.
  • Collapsing X65405 and X65405-N-C into one “8 optics” cell without dual-line visibility.
  • Ignoring NO-DATA-ATREST-ENCRYPTION×4 until security audit after PO.
  • Treating rail kits and C13-C14 jumpers as “site will supply” without a written exclusion.

Who should use this memo

Fit for enterprises and integrators already on AFF A70 multi-HA / MCC-IP-capable designs who need citation-ready pack math and adapter SKUs in contract attachments.

Unfit for teams still choosing between platforms, refusing to disclose pack SKUs, or demanding public usable-capacity quotes and channel net prices from TaoHan. Fix the equal-BOM language first; expand later.

FAQ

Does 36× X4028A-2-A-C mean only 36 drives on AFF A70?
No. X4028A-2-A-C is a dual-drive pack, so 36 packs equal 72 physical disks. Scoring 36 packs as 36 drives understates the lot by half and breaks equal-BOM ranking.
What license meter belongs on this AFF A70 worksheet?
ONTAP One Package for Flash A70 at 1100 TB. That is a license meter aligned with pack raw (~1102 TB), not ONTAP Base Flash and not application usable TB.
Which MCC-IP adapter SKU should CapEx lock for AFF A70?
A common working example lists X50132A-C ×4 (100GbE iWARP, Slot 2, e2a/e2b). Do not paste A50’s X60134A row onto an A70 scorecard without a live doc confirmation.
How many N9336C switches appear on the fabric line?
Four. Keep N9336C ×4 as a fabric/cluster row separate from pack→disk conversion and from the ONTAP One meter.
Can we peer-rank this A70 lot against a single-HA C60 worksheet?
Not as an equal BOM. Label topology first: four-node-class A70 with MCC-IP fabric rows is not a single-HA capacity-flash peer. Rank price only after the tags match. Send equal part lists to info@021taohan.com.
Why do both X65405 and X65405-N-C appear on the same worksheet?
This working BOM carries dual 100GbE SR forms: X65405-N-C ×8 and X65405 Ext Qty 8. Keep both lines until live CPQ clarifies supersession. Dropping either line to simplify ranking is an equal-BOM defect.
What does NO-DATA-ATREST-ENCRYPTION ×4 mean for CapEx?
It states a “no data-at-rest encryption” OS stance on four rows. Buyers must confirm that policy matches security requirements before PO. If DAR encryption is mandatory, freeze a different entitlement path—do not treat the screenshot as silent approval.

References

Freeze pack math and iWARP SKUs on separate lines

If your packet is AFF A70 + MCC-IP fabric, send the pack SKUs (packs ≠ disks), ONTAP One TB meter, X50132A-C rows, and N9336C quantities to Shanghai TaoHan Industrial. We help keep equal-BOM language citation-ready—without publishing net prices.

Contact TaoHan · A70 BOM freeze

Email: info@021taohan.com