Quick Take
Quick Take: After OCP on 12 October 2026, do not freeze a 2026 China RFQ on USFP or a G302 commercial-box PID. USFP is a 400Gb/s-per-lane pluggable spec (up to 12.8T). G302 is 51.2T ToR silicon with 200G SerDes and Cisco 1.6T optics. G300 is 102.4T in sampling. Keep this week's 偏离表 on orderable 800G lines. Split 13% VAT special-invoice rows on those lines. Write the 1.6T plan year as its own column — not as a fake MPN. Channel net pending confirmation. TAOHAN maps equal 智算 fabric briefs for China enterprise RFQs in one business day.
What did Cisco and NVIDIA freeze on 12 October 2026?
Quick Answer: Three identities, none a public commercial-box PID. USFP = planned 400G/lane module with NVIDIA, TE, Amphenol. G302 = 51.2T ToR silicon. G300 = 102.4T sampling. Cisco 8001 and P200 production are other H1s. Put “not a PID” on the 偏离表.
Typical scene: a 云/智算 fabric brief already named today's 800G OSFP ToR. Finance hears “1.6T and USFP at OCP” and asks to swap the PO this week so the 标书 looks current. Treat USFP like a new tire size announced before the catalog lists that size — you still buy today's tires as their own line. That is a typical 政企 bid-pack failure, not a named customer.
Official Cisco newsroom language: G302 is planned to begin shipping to customers before the end of 2026. Channel notes that say early 2027 and GA still TBD stay on this page as pending confirmation. Do not pick one date and hide the other. USFP remains a specification and a forthcoming multi-source project. No public USFP or G302 chassis MPN was published. TAOHAN will not invent one to make the 偏离表 look complete.
- Fit: open 2026 智算 RFQs that must not grow a fake USFP or G302 box line; packs that need a 1.6T plan-year field and a 13% VAT split on today's hardware; leftover 报备 that still covers this week's ToR PID.
- Unfit: a silent substitute for N9336C-SE1; a drop-in OSFP; a Cisco 8001 management box; a P200 scale-across router RFQ; writing a domestic 信创 box as a certified G302 substitute part number.
What is orderable vs still silicon or spec?
Quick Answer: Three columns on the RFQ: today's PID, a 1.6T plan year, a watch-item dated 12 October 2026. Do not invent an MPN. Soft net is industry estimate / pending confirmation. Split 13% VAT on the orderable column only.
| Line | Official 12 Oct 2026 | 偏离表 action |
|---|---|---|
| USFP | 400G/lane spec; 16 lanes OSFP-sized; path to 32; up to 12.8T; ~4× density vs 200G/lane | Watch-item. Not a hardware row. Not 现货. |
| G302 | 51.2T ToR silicon, 200G SerDes, 1.6T optics; planned ship before end of 2026 | Silicon, not a box PID. Early-2027 channel note = pending confirmation. |
| G300 | 102.4T sampling; first systems shipping | Do not merge with G302 on the same 偏离 row. |
| Today's ToR | Orderable 800G OSFP class already on the brief | Freeze PID × qty. Split 13% VAT. Ask 现货 as its own field. |
First planned USFP transceivers are described as 16 full-duplex lanes in an OSFP-sized module for switches and SuperNICs, up to 100 W without a dedicated cooling circuit in the module. That is roadmap language, not a field SKU you copy onto a 政企 pack this week. A 报备 that still covers today's ToR does not automatically cover a G302 box that has no PID.
What this page is not
Quick Answer: Not Cisco 8001 (A100 OOB 10G/1G). Not P200 production quotes. Not Live Protect mid-2027. Not a G302 sku-page. Secondary headlines that say “1.6T ToR” collapse 51.2T silicon with 1.6T optics — refuse that 偏离表 cell.
Microsoft and Alibaba Cloud P200 quotes live on Cisco newsroom. They do not make USFP orderable and they are not TAOHAN deliveries. Leave them in References. Do not write a domestic UNIX or 信创 box as a certified G302 substitute part number — that is a second H1.
Typical use cases: who must act this week?
Quick Answer: Act if this week's 标书 is about to grow a USFP or G302 box line, or if the 1.6T year was never written. Do not wait for a catalog PID that OCP did not publish. Dual-box still means two hardware bases on today's switches.
A typical scene is an 800G OSFP fabric already approved in a 政企 pack. The OCP headline lands, and someone pastes “USFP” into the 偏离表 because NVIDIA and Cisco were on the same slide. That PO comes back. Put the headline in a watch-item column. Keep SuperNIC and switch PIDs that already exist. Ask 现货 as its own field — a spec date is not a pallet, and a 13% VAT special invoice cannot be cut on a line with no MPN.
- Missing plan year: fabric at 800G, no 1.6T year — write the year, do not invent a G302 PID.
- Swapped RFQ: OCP used to overwrite this week's OSFP column — put it back.
- One 专票 blob: hardware vs watch-item need separate 13% VAT treatment. Watch-items get no 专票 line until a PID exists.
- Leftover 报备: write expiry beside today's PID. Do not assume old 报备 covers a future G302 box.
Buyer decision matrix
| Situation | List posture | RFQ ask |
|---|---|---|
| Quote grew a USFP line | Spec only on 12 Oct 2026 | Delete the PID-shaped cell; keep 800G OSFP on the 偏离表 |
| Quote grew a G302 box | Silicon; planned ship before end of 2026 (official) | No commercial-box MPN; flag vs early-2027 channel note |
| Need 1.6T endpoints later | Plan year, not a SKU | Year + current PID × qty; 13% VAT on today's hardware only |
| China 政企 pack | 偏离表 “not a PID” row; 13% VAT split | Hardware vs watch-item; 报备 date |
| Domestic 信创 swap requested | Not a certified G302 substitute | Second page — do not mix into this H1 |
How do you freeze a 2026 RFQ after OCP?
- Step 1 — Name what is not a PID — USFP is a spec. G302 is silicon. Write that on the 偏离表.
- Step 2 — Lock official identities — 51.2T / 200G SerDes / 1.6T optics; 102.4T sampling; 400G/lane up to 12.8T.
- Step 3 — Keep today's orderable column — 800G OSFP stays on the 2026 RFQ. Split 13% VAT on those lines.
- Step 4 — Add a 1.6T plan-year column — Year only. Empty is honest.
- Step 5 — Flag ship-date mismatch — Official end-2026 vs channel early-2027. Pending confirmation.
- Step 6 — 报备 and 专票 — Write leftover 报备 expiry beside today's PID. Do not cut a 专票 on a watch-item with no MPN.
RFQ checklist
Send today's ToR/spine PID × qty, HA count, optics class (800G OSFP vs 1.6T plan year), leftover 报备 expiry if any, and whether any draft already printed USFP or a G302 box. Ask for orderable vs watch-item columns and a 13% VAT split on the orderable column. Email info@021taohan.com or call 177-0882-1321. TAOHAN reviews equal 智算 fabric briefs in one business day and does not publish a list price.
Common RFQ pitfalls after OCP 12 October 2026
Buyers lose CapEx when they treat a spec as a PID, treat 51.2T silicon as a 1.6T switch, or stamp a 专票 onto a watch-item. Keep three columns: orderable, plan year, watch-item. Soft channel net remains an industry estimate / pending confirmation — never invent public RMB from the OCP headline.
- USFP on the PO: no public module MPN on 12 Oct 2026.
- G302 as 1.6T ToR: silicon is 51.2T; 1.6T is the optics class.
- G300 = G302: 102.4T sampling is not 51.2T ToR silicon.
- Spec date as 现货: stock is a separate field. Pending confirmation.
- One 专票 blob: hardware vs watch-item need separate 13% VAT treatment.
- Old 报备 covers G302: 报备 follows today's PID, not a future box with no MPN.
- 信创 as certified G302: that is a second H1. Do not mix.
Frequently Asked Questions
No. On 12 October 2026 Cisco and NVIDIA announced a 400Gb/s-per-lane spec, not a catalog PID. Do not write USFP as a 偏离表 hardware row. Freeze today's OSFP/800G class. Channel net and 13% VAT special-invoice amounts stay pending confirmation on a dated China RFQ.
No. Official identity is 51.2T ToR silicon with 200G SerDes and Cisco 1.6T optics. Mixing those two numbers in one 偏离表 cell is how a 智算 bid pack over-buys a product with no PID. Do not copy “1.6T ToR” headlines.
No. G300 is 102.4T sampling with first systems shipping. G302 is 51.2T ToR silicon planned before end of 2026 (official). Channel early-2027 / GA TBD stays pending confirmation beside that sentence. Do not merge them on the 偏离表.
Quote list, net, and discount stay off public pages. No public G302/G300/USFP commercial-box PID was published on 12 October 2026. Channel figures are industry estimate / pending confirmation. A 13% VAT special-invoice amount follows the dated RFQ, not this page.
Email today's ToR/spine PID × qty, optics class (800G OSFP vs 1.6T plan year), HA count, leftover 报备 expiry if any, and whether any draft already printed USFP or a G302 box. Write to info@021taohan.com or call 177-0882-1321.
References
Key Takeaway
Key Takeaway: On 12 October 2026, freeze USFP as a 400G/lane spec and G302 as 51.2T ToR silicon — not as 2026 偏离表 hardware rows. Keep this week's RFQ on orderable 800G PIDs, add a 1.6T plan year, split 13% VAT on today's lines, and mark G302 ship dates pending confirmation. TAOHAN supplies G302/USFP RFQ mapping with competitive pricing for China enterprise buyers, does not publish a list price, and answers at info@021taohan.com or 177-0882-1321.